Union Endicott CSD - 2017 Capital Improvements Phase 1

Description:

General Construction:

Bleacher replacement at Jennie F. Snapp.

Cabinetry and flooring replacement at Bus Garage.

All sitework including pavement reconstruction, sidewalk replacement,utilities, and canopy removal/modifications.

Electrical Construction:

Exterior light replacement at Ann G. McGuinness.

Power for new bleachers at Jennie F. Snapp.

Removal of electric outlets at Bus Garage.

Roofing Construction:

Asbestos abatement of roofing materials.

Replacement of complete roofing system at High School including fascias,wood blocking, gutters,downspouts, etc.

Estimated Construction Budget:

General Construction:  $750,000

Electrical Construction:  $35,000

Roofing Construction:  $2,100,000

Pre-Bid Meeting:

No Pre-Bid Meeting,. project sites will be available for bidders to inspect proposed work areas from 9:00 a.m.to 3:00 p.m. on weekdays by appointment with Mr.Toby Riddleberger, Director of Facilities and Safety, phone number (607) 201-4875.

Bid Opening:

Bids are due May 10, 2018 at 11:00 a.m. at the Union Endicott Central School District Office Board Room, 1100 East Main Street, Endicott, NY  13760.

Project Schedule:

Start:  Ten (10) working days after receipt of "Notice to Proceed".

Completion:  August 20, 2018

Cost Per Set:

$50.00 (non-refundable)

Architect/Engineer:

BCK-IBI Group
41 Chenango Street
Bingahmton, NY 13901
Phone: 607.772.0007
E-mail: bn_info@ibigroup.com

Additional Details:

  • Bonding: Yes
  • Tax Exempt: Yes
  • Wage Rates: No

Obtain Documents

Deposit CSD - 2016 Capital Improvements - Ph. 2

Description:

General Construction:

Elementary School:

Replacement of plastic laminate casework, including demolition of existing casework and installation of new casework.

Junior/Senior High School:

Replacement of corridor interior finishes including removal of existing glazed tile and cementitious terrazzo, installation of new epoxy terrazzo, installation of precast terrazzo bases, and reinstallation of existing glazed tile.

Installation of new corridor display cases.

Bus Garage:  Replacement of existing fixed windows with aluminum windows.

Sitework Construction: 

All paved replacement including asphalt, concrete sidewalks, and curbs.

All perimeter fencing replacement.

All lawn modifications required by paving required by paving replacement.

 

 

 

 

Estimated Construction Budget:

Budgets will be forthcoming.

Pre-Bid Meeting:

Pre-Bid Meeting will be held at the High School Auditorium, 171 Second Street, Deposit, NY  13754 at 10:00 a.m., April 25, 2018.  Project sites will be available for bidders to inspect proposed work areas from 9:00 a.m. to 3:00 p.m. on weekdays by appointment with Mr. Tom Williams, phone # (607) 467-1579.

Bid Opening:

Bids are due a the High School Main Office, 171 Second Street, Deposit, NY  13754 until 1:00 p.m. on May 8, 2018.

Project Schedule:

Start:  Ten (10 working days after receipt of "Notice to Proceed".

Completion: August 15, 2018

Cost Per Set:

$50.00 (non-refundable)

Architect/Engineer:

IBI Group
59-61 Court Street, Suite 300
Bingahmton, NY 13901
Phone: 607.772.0007
E-mail: bn_info@ibigroup.com

Additional Details:

  • Bonding: Yes
  • Tax Exempt: Yes
  • Wage Rates: Yes

Obtain Documents

Chenango Valley CSD - 2018 Capital Improvements - Ph. 1

Description:

General Construction:

Partial removal and replacement of existing roof.

Exterior masonry, concrete, and stone restoration.

Color treatment of existing masonry.

Refinishing of gymnasium flooring and modifications to equipment.

Replacement of existing porcelain wall panel with thin brick panel system.

Window Construction:

Removal of existing windows..

Installation of new windows and shades.

Painting of steel lintels.

Sitework Construction:

Pavement reconstruction and expansion.

Sidewalks.

Fence replacement.

Tennis court recoating.

Installation of netting.

Electrical Construction:

Exterior light poles and associated power.

Power to basketball backboards.

Estimated Construction Budget:

General Construction:  $300,000

Window Construction:  $1,200,000

Sitework Construction:  $1,100,000

Electrical Construction:  $150,000

Pre-Bid Meeting:

Pre-Bid Meeting will held at the Port Dickinson Elementary School, 770 Chenango Street, Binghamton, NY  13901 at 3:00 PM, April 25, 2018.  Project sites will be available for bidders to inspect proposed work areas from 9:00 AM to 3:00 PM on weekdays by appointment with Mr. George Zlock, Director of Facilities & Operations Dept., phone number (607) 760-6675.

Bid Opening:

Bids are due at the Chenango Valley Central School District Office, 221 Chenango Bridge Road, Binghamton, NY  13901 until 11:00 AM on May 8, 2018.

Project Schedule:

Start:  Ten (10) working days after receipt of "Notice to Proceed".  All on site construction to occur June 25, 2018 to August 26, 2018 with the exception of the exterior window and door replacement which shall occur June 24, 2019 to August 23, 2019.

Completion:  August 26, 2018.

Cost Per Set:

$50.00 (non-refundable)

Architect/Engineer:

IBI Group
59-61 Court Street, Suite 300
Bingahmton, NY 13901
Phone: 607.772.0007
E-mail: bn_info@ibigroup.com

Additional Details:

  • Bonding: Yes
  • Tax Exempt: Yes
  • Wage Rates: Yes

Obtain Documents